The Vale Northern System is comprised of three mine complexes: Serra Sul, Serra Norte, and Serra Leste. The system is located in the Pará state of Brazil and is fully integrated with mines, railroads, maritime terminals and a port. The mineralization is high-grade hematite ore with iron grades around 65%.
Production in the Northern System started in 1984 at the Serra Norte complex, which is currently expected to run through the late 2030s. Serra Sul started production in 2016 and is expected to produce through the late 2050s and Serra Leste began production in 2014 and is expected to produce through the late 2040s.
Production capacity is expected to increase to a long-term target of 260 Mt, which would be achieved via the approved expansion at Serra Sul and other growth projects.
The approved expansion at Serra Sul (the Serra Sul 120 Project) consists of increasing capacity at the S11D mine to a total of 120 Mt. The S11D mine is currently one of the largest iron ore mines in the world.