Producing

Diavik

Diamonds
Rio Tinto Group
NWT

,

Canada

Acquisition:

2015 / 03 / 23

Agreement:

Royalty

Terms:

1.0% GPR

The Diavik mine is Canada’s largest diamond mine, located on a 20 sq km island in Lac de Gras, Northwest Territories, approximately 300 km from Yellowknife. Access to the mine is by air year-round and by a 425 km ice road in winter that operates for eight to ten weeks between January and March. Four diamond bearing kimberlite pipes are located just off the eastern shore of the island and although the pipes are relatively small, each having surface expressions less than 200 metres in diameter, they are high grade making Diavik one of the most profitable diamond mines in the world. The majority of Diavik’s products are gem-quality white stones, which are sold to select diamantaires. In 2018, Rio Tinto revealed three of the finest rough diamonds from Diavik. The diamonds are collectively known as The Diavik Stars of the Arctic and include a 177.7 carat diamond, one of the largest and most valuable gem quality rough diamonds ever produced in Canada.

Diavik began extracting diamonds in January 2003 and has since produced more than 144 million carats of high quality rough diamonds. Open pit mining from the three pipes (A154 South, A154 North and A418) has concluded and the ore bodies are currently being mined from underground. Rio Tinto announced the opening of a fourth pipe (A21) in the third quarter of 2018 and the current mine plan has production continuing until 2026. In February 2023, Rio Tinto announced a $40 million investment in Phase 1 of the underground mining below the A21 open pit at Diavik.

The 2021 Proven and Probable Reserves for Diavik totaled 5.4 Mt grading 2.2 ct/t diamond, based on minimum 1 mm diameter diamond cut-off grade and final re-crushing size of 6 mm.

Recent Activity
  • October 2024

    The Diavik mine has safely completed the development and construction of Phase 1 of the A21 underground mine, beneath the previously mined A21 open pit, and is now in commercial production. Phase 2 of the A21 project was approved in early 2024, requiring an additional investment of US$17 million. The A21 operations allow Rio Tinto to continue operating through to closure while the company prepares for Diavik’s future closure with progressive reclamation efforts, including earthworks, site cleanup, and equipment preparation.

  • August 2023

    At Diavik, Rio Tinto will build the largest solar power plant across Canada’s territories, featuring over 6,600 solar panels that will generate approximately 4,200 megawatt-hours of carbon-free electricity annually for the mine. The solar plant is expected to cut diesel consumption by approximately one million liters per year and reduce emissions by 2,900 tonnes of CO2 equivalent, which is comparable to eliminating the emissions of 630 cars.

Use the link below to browse a list of available technical reports for the projects within Sandstorm’s portfolio. For the most up-to-date information on each project, please refer to the project operator or developer.

Investor Presentation

Download the latest Investor Presentation to learn why Sandstorm is a gold investment that stands out from the rest.

Download

Asset Handbook

With over 230 royalties acquired since 2009, we offer an exciting investment opportunity in a diverse portfolio of royalty assets. Discover all of Sandstorm’s royalties around the globe.

Download

Annual Report

Our 2023 Annual Report includes our annual Financial Statements and Management Discussion & Analysis and a letter from Sandstorm’s President & CEO.

Download

Sustainability Report

Learn more about Sandstorm’s approach to sustainability including our due diligence process, mining partnerships, and employee engagement.

Download