Acquisition Date

2022 / May / 02

Terms

2.0% NSR on oxides (after 396koz); 1.5% NSR on DCP plus production payment*

Operator

Mineros S.A.

The Gualcamayo mine is an open pit and underground heap leach operation that reached commercial production in 2009. Gualcamayo consists of three substantial zones of gold mineralization called Quebrada del Diablo (QDD), Amelia Ines-Magdalena (AIM) and QDD Lower West. QDD is a sediment-hosted disseminated gold deposit while AIM is a sulphide-bearing skarn deposit containing copper, zinc and molybdenum with gold-arsenic mineralization. Porphyry style molybdenum mineralization also occurs at the project.

The process facility at Gualcamayo is designed to treat 24,000 tpd and includes a primary, secondary and tertiary crushing circuit. Gold recovery of approximately 60% is achieved with heap leaching and activated carbon in an ADR plant where gold doré is produced and sent to a refinery.

As of June 30, 2021, Measured & Indicated Mineral Resources, OP and UG exclusive of Mineral Reserves, for Gualcamayo were estimated to total 26.3 Mt at a grade of 1.9 g/t gold for 1.6 Moz gold based on a cut-off grade of 0.2–0.4 g/t for open pit and 0.63–1.85 g/t for underground resources. In addition, Inferred Mineral Resources were estimated at16.1 Mt at a grade of 2.3 g/t gold for 1.2 Moz gold. The Proven & Probable Mineral Reserves for combined OP and UG were estimated at 3.3 Mt at 1.65 g/t gold for 174 koz gold based on a cut-off grade ranging from 0.32–0.52 g/t for open pit and 0.84 g/t for UG.

Agreement terms are subject to the closing of the Transactions as defined in the Company's press release dated May 2, 2022.

See press release for more details.

*Additional Terms

2.0% NSR on oxides

(excluding first 396 koz produced after Oct 25, 2018) capped @ $50M;

1.5% NSR

of the deep carbonate project

$30 million on commercial production of the deep carbonate project

 

Gualcamayo